Rama

DFW Connector

Highway 114/121 Construction Project

The DFW Connector project consists of a variety of work: installation of concrete protection slabs, riprap, mowstrip, drainage channels, architectural stamped concrete, cast-in-place retaining walls, concrete paving and miscellaneous concrete - at different locations spread throughout the project site.

Over 21,000 cubic yards of concrete will be placed during the course of over 500 different concrete pours. The design-build nature of the project, project phasing, and assuring smooth traffic flow into DFW International Airport is makes the logistics of placing concrete a daily challenge.

The contract value has nearly tripled due to the quality, safety and production of the work that RAMA has produced, our hard work, as well as the relationship we have cultivated with Northgate Constructors.

Owner/Agency

  • TXDOT
  • Northgate Constructors, GC

Project Location

  • Grapevine, TX

Completion Date

  • 2012

Contract Value

  • $6.5 million