Water Treatment Plant Improvements

Backwash Pond Rehabilitation

The scope of work on this project included excavation of two existing backwash ponds, installation of a recirculation pump station, underground pipe, grading, concrete lining of two existing backwash ponds, calibrating a new flow meter vault, mechanical tie-ins to the existing plant utilities, and electrical and instrumentation tie-ins to the existing operating plant system.

While working on the City of River Oaks’ only water treatment plant, the scheduling and coordination with the plant operators were of utmost importance to ensure that the city’s water supply was not impacted.

Owner/Agency

  • City of River Oaks, TX
  • ES & CM, CM

Project Location

  • River Oaks, TX

Completion Date

  • October 2012

Contract Value

  • $338,000